Back to blog
The global AI race

The AI Race May Be Won in the Power Plant

Dr. Beza LefeboVP, AI Strategy and Workforce Development. 1 min read

The artificial intelligence race is usually described through model releases and benchmark scores.

The less glamorous reality is that the race may be decided by electricity.

Every advanced model depends on data centers filled with processors that consume power and generate heat. As AI systems grow, the limiting factor may no longer be whether engineers can design a capable model. It may be whether a region can provide sufficient electricity, transmission capacity, cooling, land, and permits to operate it.

The International Energy Agency projects that global data-center electricity consumption could reach approximately 945 terawatt-hours by 2030, nearly double the 2024 level. Electricity use by accelerated servers, which is driven primarily by AI, is projected to grow by about 30 percent annually. The IEA also notes that data centers are concentrated geographically, which can create severe local grid challenges even when their share of global energy use appears manageable.

This changes the meaning of AI leadership.

A country may have excellent universities, talented engineers, and ambitious companies. If it cannot connect new data centers to reliable power, those advantages may not translate into operational capacity.

The same issue affects organizations. Leaders may approve AI strategies without asking where the computing resources will come from, whether capacity will remain available, or how infrastructure costs will affect long-term affordability.

Energy must therefore become part of AI governance.

Organizations should evaluate the efficiency of models, not only their capability. A smaller or specialized model may solve a business problem with a fraction of the computing burden. Local processing may reduce network dependence. Workloads can be scheduled, optimized, or routed based on cost and capacity.

Responsible AI adoption also requires communities to understand who bears the infrastructure cost. Innovation should not quietly transfer power, water, and grid-upgrade expenses to residents who receive little benefit.

AI is software, but at scale it is also an industrial system.

Sources and further reading

  1. International Energy Agency. “Energy and AI: Energy Demand from AI.” 2025, updated.
  2. Stanford Institute for Human-Centered AI. “The 2026 AI Index Report.” 2026.

Want your team to put ideas like this into practice? We build role-based AI training around your own policy.

Plan staff training